SR 303L over Northern Parkway

6.5 miles N of I-10 · County 013, Arizona · Built 2013 · 3 Lanes · 27,812 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
20008
Year Built
2013
Length
56.4 m (185 ft)
Max Span
27.4 m
Width
26.4 m (86.6 ft)
Lanes
3
Daily Traffic
27,812
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.