Gilbert Rd over Salt River

0.4 mi N/Thomas Rd · County 013, Arizona · Built 2024 · 4 Lanes · 14,876 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
11665
Year Built
2024
Length
438.3 m (1438 ft)
Max Span
48.8 m
Width
22.9 m (75.1 ft)
Lanes
4
Daily Traffic
14,876
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.