IRR McDowell Road over Southern Canal

0.5 mi E Jct Gilbert Rd · County 013, Arizona · Built 1977 · 7 Lanes · 21,615 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
09423
Year Built
1977
Reconstructed
2000
Length
29.9 m (98.1 ft)
Max Span
14.6 m
Width
31.6 m (103.7 ft)
Lanes
7
Daily Traffic
21,615
Material
Prestressed Concrete
Design
Tee Beam
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.