Desert Peak Pkwy over Dry Wash

0.03 mi S of Hillstone Wy · County 013, Arizona · Built 2019 · 2 Lanes · 500 vehicles/day

Overall
Good
Culvert
8
Very Good

Bridge Details

Structure #
11651
Year Built
2019
Length
6.7 m (22 ft)
Max Span
6.7 m
Width
32.3 m (106 ft)
Lanes
2
Daily Traffic
500
Material
Concrete
Design
Culvert
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.