Pinnacle Peak Rd over Dry Wash

E of Cave Creek · County 013, Arizona · Built 2006 · 3 Lanes · 6,984 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
11510
Year Built
2006
Length
7.9 m (25.9 ft)
Max Span
1.2 m
Width
24.1 m (79.1 ft)
Lanes
3
Daily Traffic
6,984
Material
Steel
Design
Culvert
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$1,000
Total Project Cost
$1,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.