Valencia Road over Pantano Wash
2 mi E of Houghton Rd · County 019, Arizona · Built 2020 · 2 Lanes · 653 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
32.1266, -110.7439
This bridge is in worse condition than 80.8% of bridges in County 019. The average bridge in Arizona is 0 years old; this one is 6 years old.
Nearby Bridges
Rita Rd over Wash
Built 1986
Valencia Road over Wash
Built 1984
Houghton Road over Wash
Built 1981
Rankin Loop E Side over Julian Wash
Built 1985
Valencia Road over Drainage Way
Built 1984
Rankin Loop W Side over Julian Wash
Built 1985
Ashford Drive over Wash
Built 1994
Azuma Way over Julian Wash
Built 1985
Vail Elementary Sh over Drainage Channel
Built 1998
PERIMETER ROAD over DRAINAGE
Built 2000
Bridge Details
- Structure #
- 11640
- Year Built
- 2020
- Length
- 114.9 m (377 ft)
- Max Span
- 38.1 m
- Width
- 14.8 m (48.6 ft)
- Lanes
- 2
- Daily Traffic
- 653
- Material
- Prestressed Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.