Houghton Road over Wash
100 ft N of Jct Rita Rd · County 019, Arizona · Built 1981 · 4 Lanes · 16,416 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
32.103056, -110.77275
This bridge is in worse condition than 69.1% of bridges in County 019. The average bridge in Arizona is 0 years old; this one is 45 years old.
Nearby Bridges
Rita Rd over Wash
Built 1986
Rankin Loop E Side over Julian Wash
Built 1985
Rankin Loop W Side over Julian Wash
Built 1985
Rees Loop over Wash
Built 1987
Ashford Drive over Wash
Built 1994
Houghton Road over Wash
Built 1962
Azuma Way over Julian Wash
Built 1985
Valencia Road over Wash
Built 1984
Vail Elementary Sh over Drainage Channel
Built 1998
Valencia Road over Drainage Way
Built 1984
Bridge Details
- Structure #
- 08931
- Year Built
- 1981
- Length
- 7.9 m (25.9 ft)
- Max Span
- 2.4 m
- Lanes
- 4
- Daily Traffic
- 16,416
- Material
- Concrete Continuous
- Design
- Culvert
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.