Alamo Rd over Wash
4.7 mi SE Jct I-40 · County 015, Arizona · Built 1996 · 2 Lanes · 371 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
34.8485, -114.109
This bridge is in worse condition than 70.6% of bridges in County 015. The average bridge in Arizona is 0 years old; this one is 30 years old.
Nearby Bridges
I 40; S Frontage R over Wash
Built 1967
I 40; EB over Wash
Built 1967
I-40 EB over MacKenzie Wash
Built 1967
I 40; WB over Wash
Built 1952
I-40 WB over Mackenzie Wash
Built 1951
I 40; E Frontage R over Wash
Built 1967
I 40; EB Ramp B over Wash
Built 1967
I 40; WB Ramp A over Wash
Built 1967
Alamo Road over I 40
Built 1969
I 40; EB & WB over Wash
Built 1967
Bridge Details
- Structure #
- 11084
- Year Built
- 1996
- Length
- 13.1 m (43 ft)
- Max Span
- 2.4 m
- Lanes
- 2
- Daily Traffic
- 371
- Material
- Steel
- Design
- Culvert
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.