Alamo Road over I 40

15.4 mi East Jct SR 95 · County 015, Arizona · Built 1969 · 2 Lanes · 329 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
5
Fair

Condition Ratings

ComponentRatingDescription
Deck 6 Satisfactory
Superstructure 7 Good
Substructure 5 Fair

Location

34.8645, -114.1475

This bridge is in worse condition than 93.6% of bridges in County 015. The average bridge in Arizona is 0 years old; this one is 57 years old.

Nearby Bridges

Bridge Details

Structure #
01316
Year Built
1969
Length
75.6 m (248 ft)
Max Span
24.7 m
Width
10.2 m (33.5 ft)
Lanes
2
Daily Traffic
329
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.