Alamo Road over I 40
15.4 mi East Jct SR 95 · County 015, Arizona · Built 1969 · 2 Lanes · 329 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 5 | Fair |
Location
34.8645, -114.1475
This bridge is in worse condition than 93.6% of bridges in County 015. The average bridge in Arizona is 0 years old; this one is 57 years old.
Nearby Bridges
I 40; WB Ramp A over Wash
Built 1967
I 40; EB & WB over Wash
Built 1967
I 40; EB Ramp B over Wash
Built 1967
I 40; E Frontage R over Wash
Built 1967
I 40; WB over Wash
Built 1952
I 40; S Frontage R over Wash
Built 1967
I 40; EB over Wash
Built 1967
Proving Ground Rd over I 40
Built 1966
I 40; WB over Willow Creek
Built 1952
I-40 EB over Willow Creek
Built 1966
Bridge Details
- Structure #
- 01316
- Year Built
- 1969
- Length
- 75.6 m (248 ft)
- Max Span
- 24.7 m
- Width
- 10.2 m (33.5 ft)
- Lanes
- 2
- Daily Traffic
- 329
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.