Mountain Road over Wash
40 ft N of E Roselle Ave · County 013, Arizona · Built 2002 · 4 Lanes · 2,663 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
33.3395, -111.5923
This bridge is in worse condition than 52.2% of bridges in County 013. The average bridge in Arizona is 0 years old; this one is 24 years old.
Nearby Bridges
Meridian Road over Wash
Built 2002
Meridian Rd (Mesa) over Drainage Channel
Built 2008
Meridian Rd (Mesa) over Power Line Fldwy Chnl
Built 2008
Mountain Rd over Powerline Floodway
Built 1991
Meridian Rd over Wash
Built 2014
Ray Rd over Powerline Fldway Channel
Built 2014
Mountain Rd over Wash
Built 2008
Signal Butte Rd over Powerline Fldway Channel
Built 2014
Ironwood Drive over Wash
Built 2009
Ironwood Drive over CAP Canal
Built 2008
Bridge Details
- Structure #
- 10445
- Year Built
- 2002
- Length
- 8.2 m (26.9 ft)
- Max Span
- 4 m
- Width
- 43.6 m (143 ft)
- Lanes
- 4
- Daily Traffic
- 2,663
- Material
- Concrete Continuous
- Design
- Culvert
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.