Mountain Rd over Powerline Floodway
1.75 mi S/ Elliot Rd · County 013, Arizona · Built 1991 · 4 Lanes · 4,419 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
33.3252, -111.5922
This bridge is in worse condition than 52.2% of bridges in County 013. The average bridge in Arizona is 0 years old; this one is 35 years old.
Nearby Bridges
Mountain Rd over Wash
Built 2008
Ray Rd over Powerline Fldway Channel
Built 2014
Meridian Rd over Wash
Built 2014
Signal Butte Rd over Powerline Fldway Channel
Built 2014
Meridian Rd (Mesa) over Power Line Fldwy Chnl
Built 2008
Meridian Rd (Mesa) over Drainage Channel
Built 2008
Mountain Road over Wash
Built 2002
Meridian Road over Wash
Built 2002
Mountain Road over ADOT Channel
Built 2022
Ironwood Drive over Wash
Built 2009
Bridge Details
- Structure #
- 07784
- Year Built
- 1991
- Reconstructed
- 2007
- Length
- 11.9 m (39 ft)
- Max Span
- 11 m
- Width
- 26.8 m (87.9 ft)
- Lanes
- 4
- Daily Traffic
- 4,419
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.