Speedway Boulevard over Ricardo Small Wash
0.3 mi E Jct Camino Seco · County 019, Arizona · Built 1987 · 5 Lanes · 18,498 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
32.2355, -110.8012
This bridge is in worse condition than 69.1% of bridges in County 019. The average bridge in Arizona is 0 years old; this one is 39 years old.
Nearby Bridges
3rd Street over Ricardo Small Wash
Built 1971
Speedway Blvd over Wash
Built 1988
5th St over Ricardo Small Wash
Built 1968
5th St over Hidden Hills Wash
Built 1985
Speedway & Keesal over Wash
Built 1988
Speedway Pl over Wash
Built 1987
Desert Aster Drive over Drainage channel
Built 1995
6th St over Hidden Hills Wash
Built 1985
Speedway Blvd over Robb Wash
Built 1988
5th St over Wash
Built 1971
Bridge Details
- Structure #
- 10266
- Year Built
- 1987
- Length
- 13.1 m (43 ft)
- Max Span
- 3 m
- Lanes
- 5
- Daily Traffic
- 18,498
- Material
- Concrete Continuous
- Design
- Culvert
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.