Speedway Blvd over Wash
20 W Jct Camino Seco Rd · County 019, Arizona · Built 1988 · 7 Lanes · 26,222 vehicles/day
Overall
Culvert
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 6 | Satisfactory |
Location
32.2355, -110.8071
This bridge is in worse condition than 80.8% of bridges in County 019. The average bridge in Arizona is 0 years old; this one is 38 years old.
Nearby Bridges
Speedway Boulevard over Ricardo Small Wash
Built 1987
Speedway & Keesal over Wash
Built 1988
3rd Street over Ricardo Small Wash
Built 1971
Speedway Pl over Wash
Built 1987
5th St over Ricardo Small Wash
Built 1968
Speedway Blvd over Robb Wash
Built 1988
Desert Aster Drive over Drainage channel
Built 1995
5th St over Robb Wash
Built 1964
Wrightstown Rd over Robb Wash
Built 1972
5th St over Hidden Hills Wash
Built 1985
Bridge Details
- Structure #
- 08998
- Year Built
- 1988
- Length
- 13.1 m (43 ft)
- Max Span
- 3 m
- Width
- 36.9 m (121.1 ft)
- Lanes
- 7
- Daily Traffic
- 26,222
- Material
- Concrete Continuous
- Design
- Culvert
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.