Mayo Blvd over Dry Wash

Mayo Blvd E/O Tatum · County 013, Arizona · Built 1998 · 3 Lanes · 12,183 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
10184
Year Built
1998
Length
13.7 m (44.9 ft)
Max Span
3 m
Width
16.5 m (54.1 ft)
Lanes
3
Daily Traffic
12,183
Material
Concrete
Design
Culvert
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$1,000
Total Project Cost
$1,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.