Mayo Bovd over Dry Wash

200 ft EO 56th St · County 013, Arizona · Built 2010 · 6 Lanes · 13,963 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
11154
Year Built
2010
Length
6.7 m (22 ft)
Max Span
1.5 m
Lanes
6
Daily Traffic
13,963
Material
Steel
Design
Culvert
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$1,000
Total Project Cost
$1,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.