Ray Road over RWCD Canal

0.2 mi E Jct Power Rd · County 013, Arizona · Built 1999 · 5 Lanes · 15,941 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
10115
Year Built
1999
Length
11.1 m (36.4 ft)
Max Span
10.4 m
Width
25.6 m (84 ft)
Lanes
5
Daily Traffic
15,941
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.