SR 202L over Sossaman Road
Jct Sossaman/Santan · County 013, Arizona · Built 2005 · 8 Lanes · 96,391 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
33.328194, -111.67025
This bridge is in worse condition than 52.2% of bridges in County 013. The average bridge in Arizona is 0 years old; this one is 21 years old.
Nearby Bridges
Ramp E-S over Drainage Channel
Built 2012
SR 202L over EMF & Roosevelt Canal
Built 2006
SR 202L over EMF & Roosevelt Canal
Built 2006
Sossaman Rd NB over Powerline Fldwy Channel
Built 1999
Sossaman Rd SB over Powerline Fldwy Channel
Built 1999
Ramp to 202 L over EMF & Roosevelt Canal
Built 2006
Ramp to 202 WB over EMF & Roosevelt Canal
Built 2006
Ray Rd over East Maricopa Floodway
Built 1999
Ray Road over RWCD Canal
Built 1999
SR 202L over Power Road
Built 2004
Bridge Details
- Structure #
- 02756
- Year Built
- 2005
- Length
- 37.8 m (124 ft)
- Max Span
- 36.3 m
- Width
- 60.4 m (198.2 ft)
- Lanes
- 8
- Daily Traffic
- 96,391
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.