PINNACLE PEAK ROAD over 39TH DRIVE DRAIN
30FT E OF 40TH LANE · County 013, Arizona · Built 1987 · 4 Lanes · 14,497 vehicles/day
Overall
Culvert
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 6 | Satisfactory |
Location
33.698283, -112.143569
This bridge is in worse condition than 78.1% of bridges in County 013. The average bridge in Arizona is 0 years old; this one is 39 years old.
Nearby Bridges
PINNACLE PEAK ROAD over 40TH LANE DRAIN
Built 1987
PINNACLE PEAK ROAD over Skunk Creek
Built 1994
39th Drive over Drainage Channel
Built 1989
Alameda Rd over Dry Wash
Built 1989
Chama Dr over Dry Wash
Built 1999
Pinnacle Peak Road over Dry Wash
Built 2014
Whispering Wind Dr over Dry Wash
Built 1989
Happy Valley Road over Dry Wash
Built 1991
I-17 over Scatter Wash South
Built 2009
Buckskin Trail over Dry wash
Built 1999
Bridge Details
- Structure #
- 10068
- Year Built
- 1987
- Length
- 8.5 m (27.9 ft)
- Max Span
- 1.5 m
- Lanes
- 4
- Daily Traffic
- 14,497
- Material
- Steel
- Design
- Culvert
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.