PINNACLE PEAK ROAD over Skunk Creek
WEST OF 35TH AVENUE · County 013, Arizona · Built 1994 · 4 Lanes · 28,050 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
33.698336, -112.1364
This bridge is in worse condition than 52.2% of bridges in County 013. The average bridge in Arizona is 0 years old; this one is 32 years old.
Nearby Bridges
PINNACLE PEAK ROAD over 39TH DRIVE DRAIN
Built 1987
PINNACLE PEAK ROAD over 40TH LANE DRAIN
Built 1987
I-17 over Scatter Wash South
Built 2009
I-17 over Scatter Wash North
Built 2009
39th Drive over Drainage Channel
Built 1989
Chama Dr over Dry Wash
Built 1999
31st Avenue over Scatter Wash
Built 1993
Happy Valley Road over Skunk Creek
Built 2005
Happy Valley Road over Skunk Creek
Built 2004
Deer Valley Road over Scatter Wash
Built 1990
Bridge Details
- Structure #
- 10004
- Year Built
- 1994
- Length
- 95.7 m (314 ft)
- Max Span
- 25.9 m
- Width
- 24.4 m (80.1 ft)
- Lanes
- 4
- Daily Traffic
- 28,050
- Material
- Prestressed Concrete Continuous
- Design
- Box Beam or Girders - Single or Spread
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.