Thunderbird Rd over Drainage Ditch
at 99th Ave Median · County 013, Arizona · Built 1972 · 6 Lanes · 24,345 vehicles/day
Overall
Culvert
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 6 | Satisfactory |
Location
33.609322, -112.26795
This bridge is in worse condition than 78.1% of bridges in County 013. The average bridge in Arizona is 0 years old; this one is 54 years old.
Nearby Bridges
Royal Ridge Rd over Drainage Ditch
Built 1972
Cameo Dr over Drainage Ditch
Built 1974
Boswell Blvd over Drainage Ditch
Built 1972
Royal Oak Rd over Drainage Ditch
Built 1972
99th Ave over Drainage Ditch
Built 1972
Greenway Rd over Drainage Ditch
Built 1972
Thunderbird Road over New River
Built 1980
Loop 101 over Drain Channel
Built 1989
Ramp to 91st. Ave. over Loop 101
Built 2002
US 60 WB; FAP 022 over New River
Built 1922
Bridge Details
- Structure #
- 09683
- Year Built
- 1972
- Reconstructed
- 1997
- Length
- 6.7 m (22 ft)
- Max Span
- 3.4 m
- Width
- 27.4 m (89.9 ft)
- Lanes
- 6
- Daily Traffic
- 24,345
- Material
- Concrete Continuous
- Design
- Culvert
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.