US 60 WB; FAP 022 over New River

11.9 mi W Jct I 17 · County 013, Arizona · Built 1922 · 3 Lanes · 27,868 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
00314
Year Built
1922
Reconstructed
2010
Length
109.7 m (359.9 ft)
Max Span
18.3 m
Width
14.6 m (47.9 ft)
Lanes
3
Daily Traffic
27,868
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,000
Total Project Cost
$2,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.