Stapley Drive over Consolidated Canal

0.1 mi S Jct Brown Rd · County 013, Arizona · Built 1964 · 4 Lanes · 15,407 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
09400
Year Built
1964
Length
16.2 m (53.1 ft)
Max Span
7.6 m
Width
22.6 m (74.1 ft)
Lanes
4
Daily Traffic
15,407
Material
Concrete Continuous
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.