University Drive over Consolidated Canal

0.3 mi W of Gilbert Road · County 013, Arizona · Built 1967 · 6 Lanes · 24,693 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
09045
Year Built
1967
Reconstructed
2000
Length
20.7 m (67.9 ft)
Max Span
7.6 m
Width
30.8 m (101 ft)
Lanes
6
Daily Traffic
24,693
Material
Concrete Continuous
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.