51st Avenue over Grand Canal

0.03 mi N of Osborn Road · County 013, Arizona · Built 1965 · 6 Lanes · 41,341 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
09183
Year Built
1965
Length
12.8 m (42 ft)
Max Span
4.9 m
Width
23.1 m (75.8 ft)
Lanes
6
Daily Traffic
41,341
Material
Concrete Continuous
Design
Culvert
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$1,000
Total Project Cost
$1,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.