43rd Avenue over Grand Canal

0.05 mi N of Osborn Road · County 013, Arizona · Built 1965 · 6 Lanes · 36,396 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
09181
Year Built
1965
Reconstructed
1973
Length
11.3 m (37.1 ft)
Max Span
5.2 m
Width
23.2 m (76.1 ft)
Lanes
6
Daily Traffic
36,396
Material
Concrete Continuous
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$1,000
Total Project Cost
$1,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.