Sweetwater Avenue over Drainage Ditch
250 ft E Jct 96th St · County 013, Arizona · Built 1983 · 2 Lanes · 3,050 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
33.6043, -111.8731
This bridge is in worse condition than 52.2% of bridges in County 013. The average bridge in Arizona is 0 years old; this one is 43 years old.
Nearby Bridges
N 96th Street over Drainage Ditch
Built 1983
Cactus Rd over Wash
Built 2009
Sweetwater over Wash
Built 1997
Capt Dreyfus St over Drain Channel
Built 1985
Larkspur Dr over Channel
Built 1994
92nd St over Channel
Built 1987
Pershing Avenue over Wash
Built 1988
Poinsettia Dr over Wash
Built 2013
92nd St over Channel
Built 2013
Cholla Street over Drainage Channel
Built 1975
Bridge Details
- Structure #
- 08784
- Year Built
- 1983
- Length
- 6.7 m (22 ft)
- Max Span
- 3 m
- Width
- 28 m (91.9 ft)
- Lanes
- 2
- Daily Traffic
- 3,050
- Material
- Concrete Continuous
- Design
- Culvert
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.