Cholla Street over Drainage Channel
at Jct N 94th Way · County 013, Arizona · Built 1975 · 2 Lanes · 1,450 vehicles/day
Overall
Culvert
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 6 | Satisfactory |
Location
33.5898, -111.8777
This bridge is in worse condition than 78.1% of bridges in County 013. The average bridge in Arizona is 0 years old; this one is 51 years old.
Nearby Bridges
Cholla Street over Drain Channel
Built 1986
Poinsettia Dr over Wash
Built 2013
92nd St over Channel
Built 2013
92nd Street over Camelback Walk Channel
Built 1981
Cactus Rd over Wash
Built 2009
Shea Blvd over Drain Channel
Built 1988
Shea Blvd over Wash
Built 1997
N 96th Street over Drainage Ditch
Built 1983
N 100th St over Drain Channel
Built 1987
N 100th St over Drainage Channel
Built 1981
Bridge Details
- Structure #
- 08674
- Year Built
- 1975
- Length
- 19.5 m (64 ft)
- Max Span
- 3 m
- Width
- 59.7 m (195.9 ft)
- Lanes
- 2
- Daily Traffic
- 1,450
- Material
- Concrete Continuous
- Design
- Culvert
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.