Pendleton Drive over Josephine Canyon
6.5 Mi N Rio Rico Dr. · County 023, Arizona · Built 1979 · 2 Lanes · 1,590 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
31.5519, -111.0337
This bridge is in worse condition than 48.2% of bridges in County 023. The average bridge in Arizona is 0 years old; this one is 47 years old.
Nearby Bridges
I 19; NB-SB & EFR over Niger Canyon
Built 1978
I 19; NB over Access Road; Wash
Built 1978
I 19; SB over Access Rd Wash
Built 1978
I 19; EFR over Arroyo Angulo Agudo
Built 1930
I 19; N & S & WFR over Wash
Built 1978
I 19; EFR over Wash
Built 1978
I19; NB-SB & Ramps over Rock Corral
Built 1978
I 19; NB over Cross Road
Built 1978
I 19; SB over Cross Road
Built 1978
I 19 NB-SB-EFR over Tinaja Canyon
Built 1978
Bridge Details
- Structure #
- 08484
- Year Built
- 1979
- Length
- 47.2 m (154.9 ft)
- Max Span
- 22.9 m
- Width
- 10.2 m (33.5 ft)
- Lanes
- 2
- Daily Traffic
- 1,590
- Material
- Prestressed Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.