I 19 NB-SB-EFR over Tinaja Canyon
9.9 mi North Jct SR 289 · County 023, Arizona · Built 1978 · 6 Lanes · 17,510 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
31.558333, -111.055556
This bridge is in worse condition than 48.2% of bridges in County 023. The average bridge in Arizona is 0 years old; this one is 48 years old.
Nearby Bridges
I 19; SB over Cross Road
Built 1978
I 19; NB over Cross Road
Built 1978
I19; NB-SB & Ramps over Rock Corral
Built 1978
I 19; EFR over Rock Corral Canyon
Built 1952
I 19; SB over Access Rd Wash
Built 1978
I 19; EFR over Arroyo Angulo Agudo
Built 1930
I 19; NB over Access Road; Wash
Built 1978
I 19; NB-SB & EFR over Niger Canyon
Built 1978
Pendleton Drive over Josephine Canyon
Built 1979
I 19; EFR over Wash
Built 1978
Bridge Details
- Structure #
- 06665
- Year Built
- 1978
- Length
- 11.3 m (37.1 ft)
- Max Span
- 2.4 m
- Lanes
- 6
- Daily Traffic
- 17,510
- Material
- Steel
- Design
- Culvert
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.