Magee Rd WB over Drainage Channel
180 ft E Oldfather · County 019, Arizona · Built 1978 · 1 Lanes · 2,534 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
32.351831, -111.05485
This bridge is in worse condition than 69.1% of bridges in County 019. The average bridge in Arizona is 0 years old; this one is 48 years old.
Nearby Bridges
Magee Rd EB over Drainage Channel
Built 1977
Old Father Road over Drainageway
Built 1980
Barque Dr over Drainageway
Built 1980
Soledad Avenue over Drainage Channel
Built 1977
Old Father Road over Drainageway Channel
Built 1977
Goshen Drive over Small Wash
Built 2005
Cortaro Farms Rd over Medium Wash
Built 2012
Ina Rd over Union Pacific RR
Built 2018
Ina Rd over I-10
Built 2018
Ina Road over Canada Del Oro Wash
Built 1984
Bridge Details
- Structure #
- 08462
- Year Built
- 1978
- Length
- 6.4 m (21 ft)
- Max Span
- 3 m
- Width
- 7.9 m (25.9 ft)
- Lanes
- 1
- Daily Traffic
- 2,534
- Material
- Concrete Continuous
- Design
- Culvert
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.