Soledad Avenue over Drainage Channel

300 ft N Orangewood · County 019, Arizona · Built 1977 · 2 Lanes · 297 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
08460
Year Built
1977
Length
11.6 m (38.1 ft)
Max Span
11.6 m
Width
15.2 m (49.9 ft)
Lanes
2
Daily Traffic
297
Material
Prestressed Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.