Geronimo Trail over Sycamore Creek
28.4 mi E Jct SR 80 · County 003, Arizona · Built 1936 · 2 Lanes · 40 vehicles/day
Overall
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
31.443269, -109.139453
This bridge is in worse condition than 88.8% of bridges in County 003. The average bridge in Arizona is 0 years old; this one is 90 years old.
Bridge Details
- Structure #
- 08104
- Year Built
- 1936
- Length
- 8.2 m (26.9 ft)
- Max Span
- 7.6 m
- Width
- 6.2 m (20.3 ft)
- Lanes
- 2
- Daily Traffic
- 40
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $1,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.