Geronimo Trail over Sycamore Creek

28.4 mi E Jct SR 80 · County 003, Arizona · Built 1936 · 2 Lanes · 40 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
5
Fair

Condition Ratings

ComponentRatingDescription
Deck 5 Fair
Superstructure 6 Satisfactory
Substructure 5 Fair

Location

31.443269, -109.139453

This bridge is in worse condition than 88.8% of bridges in County 003. The average bridge in Arizona is 0 years old; this one is 90 years old.

Nearby Bridges

Bridge Details

Structure #
08104
Year Built
1936
Length
8.2 m (26.9 ft)
Max Span
7.6 m
Width
6.2 m (20.3 ft)
Lanes
2
Daily Traffic
40
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$1,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.