GERONIMO TRAIL over MILLER CREEK
.2 MI S/O MILLER SPRING · County 003, Arizona · Built 1958 · 1 Lanes · 50 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
31.488717, -109.073792
This bridge is in worse condition than 64.3% of bridges in County 003. The average bridge in Arizona is 0 years old; this one is 68 years old.
Bridge Details
- Structure #
- 030501000003201
- Year Built
- 1958
- Length
- 7.6 m (24.9 ft)
- Max Span
- 7.3 m
- Width
- 4.9 m (16.1 ft)
- Lanes
- 1
- Daily Traffic
- 50
- Material
- Concrete
- Design
- Slab
- Owner
- U.S. Forest Service
- Last Inspected
- N/A
- Est. Improvement
- $130,000
- Total Project Cost
- $170,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.