GERONIMO TRAIL over MILLER CREEK

.2 MI S/O MILLER SPRING · County 003, Arizona · Built 1958 · 1 Lanes · 50 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 8 Very Good
Superstructure 8 Very Good
Substructure 7 Good

Location

31.488717, -109.073792

This bridge is in worse condition than 64.3% of bridges in County 003. The average bridge in Arizona is 0 years old; this one is 68 years old.

Nearby Bridges

Bridge Details

Structure #
030501000003201
Year Built
1958
Length
7.6 m (24.9 ft)
Max Span
7.3 m
Width
4.9 m (16.1 ft)
Lanes
1
Daily Traffic
50
Material
Concrete
Design
Slab
Owner
U.S. Forest Service
Last Inspected
N/A
Est. Improvement
$130,000
Total Project Cost
$170,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.