US 60 over Drainage Channel

21.0 mi E Jct I-10 · County 013, Arizona · Built 1990 · 6 Lanes · 97,000 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
06915
Year Built
1990
Length
7 m (23 ft)
Max Span
2.4 m
Lanes
6
Daily Traffic
97,000
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,000
Total Project Cost
$2,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.