I 10; EB & WB over Wash

3.2 mi E Jct US 95 · County 012, Arizona · Built 1960 · 4 Lanes · 25,358 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
05407
Year Built
1960
Reconstructed
1980
Length
27.7 m (90.9 ft)
Max Span
3 m
Lanes
4
Daily Traffic
25,358
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,000
Total Project Cost
$3,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.