I 10; EB & WB over Wash

0.7 mi E Jct US 95 · County 012, Arizona · Built 1964 · 6 Lanes · 24,161 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
05401
Year Built
1964
Reconstructed
2002
Length
13.1 m (43 ft)
Max Span
3 m
Lanes
6
Daily Traffic
24,161
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,000
Total Project Cost
$3,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.