WEST TURKEY CREEK over TURKEY CREEK

9.7 MI E/O AZ 181 · County 003, Arizona · Built 1955 · 1 Lanes · 60 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
030501000003256
Year Built
1955
Length
7.9 m (25.9 ft)
Max Span
7.6 m
Width
5 m (16.4 ft)
Lanes
1
Daily Traffic
60
Material
Concrete
Design
Slab
Owner
U.S. Forest Service
Last Inspected
N/A
Est. Improvement
$150,000
Total Project Cost
$190,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.