WEST TURKEY CREEK over TURKEY CREEK

9 MI E/O AZ 181 · County 003, Arizona · Built 1955 · 1 Lanes · 60 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
030501000003255
Year Built
1955
Length
8 m (26.2 ft)
Max Span
7.6 m
Width
5.3 m (17.4 ft)
Lanes
1
Daily Traffic
60
Material
Concrete
Design
Slab
Owner
U.S. Forest Service
Last Inspected
N/A
Est. Improvement
$150,000
Total Project Cost
$190,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.