FDR 24 over EAST FORK BLACK RIVER

0.42 MI SW/O BUFFALO X CG · County 011, Arizona · Built 2022 · 2 Lanes · 100 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Condition Ratings

ComponentRatingDescription
Deck 8 Very Good
Superstructure 8 Very Good
Substructure 8 Very Good

Location

33.761097, -109.357019

This bridge is in worse condition than 41.8% of bridges in County 011. The average bridge in Arizona is 0 years old; this one is 4 years old.

Nearby Bridges

Bridge Details

Structure #
030101000035583
Year Built
2022
Length
30.5 m (100.1 ft)
Max Span
29.2 m
Width
7.4 m (24.3 ft)
Lanes
2
Daily Traffic
100
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
U.S. Forest Service
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.