FDR 24 over EAST FORK BLACK RIVER
0.42 MI SW/O BUFFALO X CG · County 011, Arizona · Built 2022 · 2 Lanes · 100 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
33.761097, -109.357019
This bridge is in worse condition than 41.8% of bridges in County 011. The average bridge in Arizona is 0 years old; this one is 4 years old.
Bridge Details
- Structure #
- 030101000035583
- Year Built
- 2022
- Length
- 30.5 m (100.1 ft)
- Max Span
- 29.2 m
- Width
- 7.4 m (24.3 ft)
- Lanes
- 2
- Daily Traffic
- 100
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- U.S. Forest Service
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.