FDR 25 over BLACK RIVER
5 MI N/O 25R RD INT · County 011, Arizona · Built 1961 · 2 Lanes · 100 vehicles/day
Overall
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
33.703825, -109.453103
This bridge is in worse condition than 79.1% of bridges in County 011. The average bridge in Arizona is 0 years old; this one is 65 years old.
Bridge Details
- Structure #
- 030101000003277
- Year Built
- 1961
- Length
- 50 m (164 ft)
- Max Span
- 10.7 m
- Width
- 9.4 m (30.8 ft)
- Lanes
- 2
- Daily Traffic
- 100
- Material
- Concrete
- Design
- Slab
- Owner
- U.S. Forest Service
- Last Inspected
- N/A
- Est. Improvement
- $200,000
- Total Project Cost
- $250,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.