IRR SR 264 over Ganado Wash

0.7 mi W Jct US 191 · County 001, Arizona · Built 2017 · 3 Lanes · 5,954 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
02886
Year Built
2017
Length
66.8 m (219.2 ft)
Max Span
21.9 m
Width
26.3 m (86.3 ft)
Lanes
3
Daily Traffic
5,954
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.