IRR BIA RTE N203 over KIN LI CHEE WASH
2.8 MI N OF AZ 264 ON 930 · County 001, Arizona · Built 1960 · 1 Lanes · 302 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
4
Poor
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 4 | Poor |
Location
35.752267, -109.424053
This bridge is in worse condition than 95% of bridges in County 001. The average bridge in Arizona is 0 years old; this one is 66 years old.
Nearby Bridges
IRR BIA ROUTE N39 over KINLICHEE WASH
Built 2014
IRR BIA RTE N39 over SAGE WASH
Built 1959
IRR BIA RTE N203 over RUIN WASH
Built 2004
SR264 over Fish Wash
Built 2015
IRR BIA RTE N39 over LONE TULE WASH
Built 1959
IRR BIA RTE N27 over GANADO WASH
Built 1974
IRR BIA RTE N9202 over GANADO WASH
Built 1990
IRR SR 264 over Ganado Wash
Built 2017
PARK ENTRANCE ROAD over UNNAMED WASH
Built 2000
IRR SR 264 over Wash
Built 1970
Bridge Details
- Structure #
- 00000000000N629
- Year Built
- 1960
- Reconstructed
- 1980
- Length
- 13.6 m (44.6 ft)
- Max Span
- 4.2 m
- Width
- 4.9 m (16.1 ft)
- Lanes
- 1
- Daily Traffic
- 302
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- Bureau of Indian Affairs
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $672,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.