SR 202 over Recker Road
Recker/Santan · County 013, Arizona · Built 2006 · 6 Lanes · 68,514 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
33.328222, -111.704139
This bridge is in worse condition than 52.2% of bridges in County 013. The average bridge in Arizona is 0 years old; this one is 20 years old.
Nearby Bridges
SR 202L over Power Road
Built 2004
Higley Road over 202 Loop Santan Freeway
Built 2006
Ramp to 202 L over EMF & Roosevelt Canal
Built 2006
Ramp to 202 WB over EMF & Roosevelt Canal
Built 2006
SR 202L over EMF & Roosevelt Canal
Built 2006
SR 202L over EMF & Roosevelt Canal
Built 2006
Ray Road over RWCD Canal
Built 1999
Ray Rd over East Maricopa Floodway
Built 1999
Sossaman Rd SB over Powerline Fldwy Channel
Built 1999
Sossaman Rd NB over Powerline Fldwy Channel
Built 1999
Bridge Details
- Structure #
- 02780
- Year Built
- 2006
- Length
- 37.8 m (124 ft)
- Max Span
- 36.3 m
- Width
- 45.1 m (148 ft)
- Lanes
- 6
- Daily Traffic
- 68,514
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.