I 10 WB over 29th Street
0.6 mi N Jct I-19 · County 019, Arizona · Built 2004 · 5 Lanes · 92,815 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
32.1997, -110.979
This bridge is in worse condition than 80.8% of bridges in County 019. The average bridge in Arizona is 0 years old; this one is 22 years old.
Nearby Bridges
I 10 EB over 29th Street
Built 2004
Ramp E-S over Ramp EB
Built 2003
I-10 & Ramps over Greyhound Wash
Built 2005
Ramp to I-10 NW over I 10 Mainline
Built 2003
I 19 Ramp N over I 10
Built 2003
12th to 29th Ramp over I-10
Built 2003
Ramp - WS over I-19 ramps & I-10 EB/WB
Built 2004
22nd St&Osborne over Drainageway
Built 1998
Silverlake Road over Santa Cruz River
Built 2000
12th Ave. CR over Ramp N-E
Built 2004
Bridge Details
- Structure #
- 02604
- Year Built
- 2004
- Length
- 47.2 m (154.9 ft)
- Max Span
- 22.9 m
- Width
- 32.9 m (107.9 ft)
- Lanes
- 5
- Daily Traffic
- 92,815
- Material
- Prestressed Concrete Continuous
- Design
- Box Beam or Girders - Single or Spread
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.