Ramp E-S over Ramp EB

Jct I-19 · County 019, Arizona · Built 2003 · 2 Lanes · 23,905 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
02598
Year Built
2003
Length
141.7 m (464.9 ft)
Max Span
54.9 m
Width
13 m (42.7 ft)
Lanes
2
Daily Traffic
23,905
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Single or Spread
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.