SR 85 over Lewis Prison Road

16.1 mi S of I-10 · County 013, Arizona · Built 2005 · 2 Lanes · 7,736 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 8 Very Good
Substructure 7 Good

Location

33.196236, -112.6501

This bridge is in worse condition than 52.2% of bridges in County 013. The average bridge in Arizona is 0 years old; this one is 21 years old.

Nearby Bridges

Bridge Details

Structure #
02524
Year Built
2005
Length
42.1 m (138.1 ft)
Max Span
40.2 m
Width
13.7 m (44.9 ft)
Lanes
2
Daily Traffic
7,736
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.