SR 85 over Rainbow Wash

20.8 mi N Jct SR B 8 · County 013, Arizona · Built 1956 · 2 Lanes · 7,264 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
00466
Year Built
1956
Length
24.7 m (81 ft)
Max Span
9.1 m
Width
13.7 m (44.9 ft)
Lanes
2
Daily Traffic
7,264
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.