I 19; W Frontage R over Peck Canyon
0.5 mi N Peck Cyn TI · County 023, Arizona · Built 1930 · 2 Lanes · 210 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
31.5107, -111.0148
This bridge is in worse condition than 65.7% of bridges in County 023. The average bridge in Arizona is 0 years old; this one is 96 years old.
Nearby Bridges
I 19; SB over Peck Canyon Wash
Built 1951
I 19; NB over Peck Canyon Wash
Built 1966
Peck Canyon Rd over I 19
Built 1966
Palo Parado Rd over I 19
Built 1966
I 19; NB over Agua Fria Canyon
Built 1951
I 19; SB over Agua Fria Canyon
Built 1967
I 19; EFR over Wash
Built 1978
I 19; N & S & WFR over Wash
Built 1978
I-19 W Frontage Rd over Agua Fria Canyon
Built 1979
Pendleton Drive over Josephine Canyon
Built 1979
Bridge Details
- Structure #
- 02058
- Year Built
- 1930
- Reconstructed
- 1980
- Length
- 33.5 m (109.9 ft)
- Max Span
- 6.7 m
- Width
- 10.2 m (33.5 ft)
- Lanes
- 2
- Daily Traffic
- 210
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.