US 60 over Carrizo Creek
12.6 mi W Jct SR 73 · County 007, Arizona · Built 1976 · 2 Lanes · 3,004 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
33.9842, -110.2812
This bridge is in worse condition than 42.1% of bridges in County 007. The average bridge in Arizona is 0 years old; this one is 50 years old.
Nearby Bridges
Bridge Details
- Structure #
- 01702
- Year Built
- 1976
- Length
- 140.5 m (461 ft)
- Max Span
- 23.2 m
- Width
- 14.2 m (46.6 ft)
- Lanes
- 2
- Daily Traffic
- 3,004
- Material
- Prestressed Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,000
- Total Project Cost
- $3,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.