IRR BIA RTE 35 over CORDUROY CREEK
IN VILLAGE OF CARRIZO · County 007, Arizona · Built 1973 · 2 Lanes · 40 vehicles/day
Overall
Deck
5
Fair
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
33.997986, -110.284861
This bridge is in worse condition than 91.1% of bridges in County 007. The average bridge in Arizona is 0 years old; this one is 53 years old.
Bridge Details
- Structure #
- 00000000000H064
- Year Built
- 1973
- Length
- 37.4 m (122.7 ft)
- Max Span
- 18.3 m
- Width
- 12.5 m (41 ft)
- Lanes
- 2
- Daily Traffic
- 40
- Material
- Prestressed Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- Bureau of Indian Affairs
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.